House Concurrent Resolution 9 of 2011

rss | Printer Friendly
Previous Resolution      Next Resolution

Categories

A concurrent resolution to urge the Federal Energy Regulatory Commission to grant a rehearing and modify its December 16, 2010 order approving the Midwest Independent Transmission System Operator's cost allocation proposal to share transmission costs.

Documents

Bill Document Formatting Information
House Introduced Concurrent Resolution
Introduced Concurrent Resolutions appear as they were introduced and reflect no subsequent amendments or changes
As Adopted by the House
The As Adopted by the House version is the Concurrent Resolutions, as introduced, that includes any adopted House amendments
As Adopted by the Senate
The As Adopted by the Senate version is the Concurrent Resolutions, as received from the House, that includes any adopted Senate amendments

History

(House actions in lowercase, Senate actions in UPPERCASE)
Note: A page number of 0 indicates that the page number is coming soon
Date Journal Action
3/15/2011 HJ 25 Pg. 311 introduced by Representative Amanda Price
3/15/2011 HJ 25 Pg. 311 referred to Committee on Energy and Technology
5/03/2011 HJ 38 Pg. 567 reported with recommendation with substitute H-1
5/10/2011 HJ 41 Pg. 618 substitute H-1 adopted
5/10/2011 HJ 41 Pg. 618 adopted and transmitted
5/11/2011 SJ 40 Pg. 648 RULES SUSPENDED
5/11/2011 SJ 40 Pg. 648 REFERRED TO COMMITTEE ON ENERGY AND TECHNOLOGY
6/08/2011 SJ 51 Pg. 1438 REPORTED FAVORABLY WITH SUBSTITUTE S-1
6/08/2011 SJ 51 Pg. 1438 PLACED ON ORDER OF RESOLUTIONS
6/29/2011 SJ 60 Pg. 1702 SUBSTITUTE S-1 ADOPTED
6/29/2011 SJ 60 Pg. 1702 ADOPTED AS SUBSTITUTED S-1
6/29/2011 HJ 62 Pg. 1992 returned from Senate with substitute S-1
6/30/2011 HJ 63 Pg. 2003 Senate substitute S-1 concurred in